From material selection to the final sink hookup, Lorett's handles your countertop replacement start to finish — templated to your actual cabinets, installed right, and with one point of contact the whole way through.
Tell us a bit about your kitchen countertop project and we'll follow up with an honest estimate — no pressure, no upsell.
Countertop replacement in Tulsa comes with its own set of real, practical considerations — here's what we plan around on every project.
A lot of Tulsa kitchens still sit on cabinets from the 1970s or 1980s. Stone is heavy, so before anything goes on top we check that your base cabinets are solid, level, and properly supported — and tell you straight if they aren't.
Decades of settling on Oklahoma clay soil means very few kitchen walls are perfectly straight. Your countertops are templated from your actual installed cabinets and walls, not from a drawing, so seams, overhangs, and backsplash lines fit tight.
Some quartz can discolor with years of strong direct sun, and a west-facing kitchen window in a Tulsa summer gets plenty of it. If your counters get that kind of light, we'll point you to materials that will still look right years from now.
Between tear-out and install, your kitchen is down for a few days. We tell you exactly which days before we start, and we coordinate plumbing so your sink and faucet are reconnected as soon as the new tops are set.
Every countertop project is different — here's a starting point based on scope and budget.
A free look at your kitchen, cabinets, and how you use it.
Material, color, edge profile, and sink, picked out together.
Precise measurements taken from your actual cabinets.
Old tops out, new tops set, sink and faucet reconnected.
We don't call it done until you agree it's done.



Neither is better across the board. Quartz is consistent in color, doesn't need sealing, and is easy to live with day to day. Granite is natural stone — every slab is one of a kind, and it handles heat better, but it needs a periodic seal. We'll help you pick based on how your family actually cooks, not what's trending.
Stone countertops usually take about 1–3 weeks from templating to install while the tops are fabricated, then the install itself is typically a single day. Your kitchen is only out of commission for a few days in that window, and we'll tell you exactly which ones.
Not if your cabinets are solid and level. Plenty of our countertop jobs go right on top of existing cabinets. If yours are sagging or water-damaged, we'll tell you before new stone goes on them — not after.
Most backsplash tile doesn't come off cleanly when the old counters are removed, so it usually gets replaced along with the tops. We'll let you know up front whether yours can stay, and we can match or update it as part of the project.
Yes. We disconnect the old sink, set the new one — including undermount sinks cut to fit your new tops — and reconnect the plumbing so you're back up and running.
Tulsa and the surrounding area, including Broken Arrow, Owasso, Jenks, Bixby, Sand Springs, Sapulpa, Glenpool, Coweta, Claremore, Skiatook, and Catoosa.
Family, female, and veteran owned. Free, honest estimates — no pressure, no upsell.